Land preparation work
March 23, 2017
Installation of fixed point observation cameras
Fixed-point surveillance cameras were installed prior to the antenna foundation work from April 2017.
They are intended to capture the status of the construction site on a regular basis. Eventually, we plan to connect the images in chronological order and leave them as recorded video (video).

July 4, 2016
Land preparation work
Land preparation work (stump removal, topsoil removal, land preparation, slope, drainage ditch maintenance, etc.) was started on the site after cutting trees and completed by the end of the year.

June 30, 2016
Anzen-kigan-sai (a ceremony performed to pray for safety) before land preparation
Anzen-kigan-sai was held by the contractors (Co. TAKEHANA-GUMI).