Daily Events on 2009/05/30 (Sat)

last updated at  2009/05/30 11:28:18 JST


<< prev day

�@

next day >>


Station

Pass No.
20090530-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0200

08:18:22

08:31:14

51.5

AOCS: Upload pointing table
OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
DR playback (by OP)

SNT1

4000

09:09:08

09:21:40

22.2

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
EIS: Table Upload
SOT: Table Upload

USC20

0300

09:57:23

10:06:56

10.9

DR playback (by OP)
XRT: Table Uplaod

USC34

0400

20:20:39

20:32:44

18.9

DR playback (by OP)

USC34

0500

21:58:11

22:10:30

30.8

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

* Request AOCS pointing table update in first pass today. *

Note: XRT will conduct remote operations from MAY 29 through JUN 12. Please use Yugma for the morning operations meetings, and dial in to the telecon phone number (see telephone-number card in Hinode morning-meeting room).
To contact the XRT Chief Observer, please call +1-617-496-1156 (US phone number).

Co-alignment program run:
Please run co-alignment program on June 1 for the three instruments.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA periods.



SOT:
- Requests AOCS pointing table update in first pass today, to choose target for HOP 71 observations starting at 8:30 or 9:00 UT coordinated with VTT in Tenerife
- Sunrise campaign program tests
- Needs 3 hours fixed pointing at disk center for post-bakeout flat fields, once each day this week.
- Mg tests for HOPs 71 and 120 (Sunrise launch).
- HOP 71 target is AR-type region in E.

XRT:
- XRT supports HOP71 with the low cadence
- Multi-filter synoptics.
- The test of the standard XOB  for an active region. (The required duration is short).
- Observe AR at E limb.


EIS:
- Limb AR observations (Mason et al.).
- Sensitivity monitoring.
- Support HOP 71.



Maintenance Note: LMSAL computer system to be shut down for maintenance,
08:30 JST Sat 30 May, for approximately 24 hours.  So SOT web pages and data distribution will not be available from LMSAL (still available from Japan).



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Sterling

H. Watanabe/Orozco

Grigis (RCO)

Williams (RCO)

MORNING


operation files

pointing file : none