| Daily Events on 2009/05/29 (Fri) | last updated at 2009/05/29 10:35:59 JST |
| Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
|
AOS |
LOS |
||||
USC20 |
0200 |
09:19:00 |
09:31:15 |
29.7 |
DR playback (by OP) |
USC34 |
0400 |
21:20:26 |
21:34:02 |
84.3 |
DR playback (by OP) |
|
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information
daily note Weekly meeting Note: XRT will conduct remote operations from MAY 29 through JUN 12. Please use Yugma for the morning operations meetings, and dial in to the telecon phone number (see telephone-number card in Hinode morning-meeting room). To contact the XRT Chief Observer, please call +1-617-496-1156 (US phone number). SOT: - May request AOCS pointing table update in first pass today, to choose target for HOP 71 observations coordinated with VTT in Tenerife - Sunrise campaign program tests - Needs 3 hours fixed pointing at disk center for post-bakeout flat fields, once each day this week. Co-alignment program run: Please run co-alignment program on June 1 for the three instruments. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA periods.
|
|
operation files pointing file : none |