| Daily Events on 2026/08/04 (Tue) | last updated at 2026/07/28 13:47:33 JST |
| Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
|
AOS |
LOS |
||||
USC20 |
0100 |
08:32:48 |
08:44:53 |
21.7 |
OP/OG upload XRT: TI-CMD EIS: TI-CMD SOT: TI-CMD DR playback (by OP) XRT: Bakeout Heater ON |
PRT1 |
2000 |
09:54:28 |
10:05:33 |
12.5 |
OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup) AOCS: Upload pointing table XRT: Bakeout Heater ON |
USC20 |
0200 |
10:09:22 |
10:21:18 |
26.4 |
DR playback (by OP) XRT: Table Upload XRT: Bakeout Heater ON |
USC20 |
0400 |
22:07:57 |
22:21:20 |
81.3 |
DR playback (by OP) XRT: Bakeout Heater ON |
|
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information
daily note Co-alignment program run: Please run co-alignment program during the period for the three instruments. - If the solar condition is not permitted, please delay to the next timeline. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA and twilight periods. - For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program - For EIS, please run Imada's new co-alignment program XRT: - HOP 81 - HOP 130 - HOP 173 - HOP 538 - HOP 349 (4-6 UT, daily) - Regular synoptic (HOP 448) - AR obs. - End of CCD bakeout (08/05) - Post Bakeout Program (08/05)
|
|
operation files pointing file : none |