Daily Events on 2026/06/23 (Tue)

last updated at  2026/06/23 10:32:01 JST


<< prev day

@

next day >>


Station

Pass No.
20260623-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

KRN1

6010

07:57:00

08:10:47

82.1

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
XRT: Bakeout Heater ON

USC20

0300

09:16:56

09:29:52

72.5

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
DR playback (by OP)
XRT: Bakeout Heater ON

KRN1

6020

09:34:06

09:47:48

66.7

XRT: Table Upload
XRT: Bakeout Heater ON

SNT1

4010

10:07:27

10:20:07

28.4

Backup for Table Uploads
XRT: Bakeout Heater ON

USC20

0500

21:16:25

21:28:58

24.1

DR playback (by OP)
XRT: Bakeout Heater ON

USC20

0600

22:53:55

23:05:47

24.4

DR playback (by OP)
XRT: Bakeout Heater ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2026/06/23 10:31:00 - 2026/06/30 11:28:00 (UT)

Remaining amount
(prediction)

1655 Mbits @ OP_START ( 2026/06/23 10:31:00 )


Please be sure to use more than 673Mbits of observation data by the first 00:00UT in order to avoid the situation of an empty DR.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

13022

5546

5546

DR TLMLMT [Mbits]

2730 @OP_START
-> 16320

6882

6882


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

SOT:
RCO phone = +1 408 720 8116
- HOP485 South (6/28)
- AR obs.


XRT:
- HOP349 (circa 4UT)
- HOP485 South (6/28, HOP485 North completed on 6/21)
- XRT to end CCD bakeout by OP circa 6:46UT on June 24th, 2026
- Post CCD bakeout circa 12:50UT on June 24th, 2026 (Timing TBD)
- AR obs.

EIS:
- HOP485 South (6/28)
- AR obs.



Timing of POINTING TBD (need obev)

POINTING:
2026/06/24 12:50:00.000    | -528.4    | -528.4  | Post bakeout Q1
2026/06/24 13:00:00.000    |  528.4    | -528.4  | Post bakeout Q2
2026/06/24 13:10:00.000    |  528.4    |  528.4  | Post bakeout Q3
2026/06/24 13:20:00.000    | -528.4    |  528.4  | Post bakeout Q4
2026/06/24 13:30:00.000    |    0.0    |    0.0  | Post bakeout synoptics
2026/06/24 13:40:00.000    |    0.0    |    0.0  | (End of synoptic)
EOP




CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Enohi

Matsumoto

DeRosa (RCO)

Sakao

Matsumoto

MORNING


operation files

pointing file : cmdpln/20260623/re-point_202606236010.txt