Daily Events on 2026/03/17 (Tue)

last updated at  2026/03/21 19:38:41 JST


<< prev day

@

next day >>


Station

Pass No.
20260317-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC34

0100

08:13:11

08:24:01

13.1

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
DR playback (by OP)

USC34

0200

09:48:30

10:01:13

46.6

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
DR playback (by OP)

SNT1

4000

10:38:26

10:51:50

65.0

XRT: Table upload

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2026/03/17 11:02:00 - 2026/03/19 10:28:00 (UT)

Remaining amount
(prediction)

4645 Mbits @ OP_START ( 2026/03/17 11:02:00 )


DR usage: The DR would become empty on Mar 18 at 13 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

3363

1432

1432

DR TLMLMT [Mbits]

1115 @OP_START
-> 5377

2273

2273


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

XRT:
- HOP 206
- Synoptic (HOP 448)
- HOP 349 (4-6UT Daily)
- AR obs.

EIS:
- HOP 206(3/18)
- AR obs.

SOT: (RCO phone: +17204927731)
- HOP 206 (3/18)
- AR obs.

[Maintenance Note (Saruki)]
The following machines will be maintained at 15:00-18:00(JST) on Tuesday, March 17th.
The machines will be rebooted.
Data distributors for real time operation are not related to this maintenance.
Please report if you have any trouble.
 Telemetry gateway machines from non-JAXA stations



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Enohi

Matsumoto

Lacatus (RCO)

SATO

Matsumoto/Ohshima

MORNING


operation files

pointing file : cmdpln/20260317/re-point_202603170100.txt