Daily Events on 2026/02/17 (Tue)

last updated at  2026/02/17 11:21:02 JST


<< prev day

�@

next day >>


Station

Pass No.
20260217-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

08:06:10

08:16:11

10.3

OP/OG upload
SOT: TI-CMD
XRT: TI-CMD
EIS: TI-CMD
DR playback (by OP)

USC20

0200

09:41:00

09:53:36

57.4

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
DR playback (by OP)
EIS: Table upload
SOT: Table Upload

KRN1

6020

11:34:57

11:48:31

55.4

Monitoring after solar eclipse
(OP issues AOCU_SLR_ECLPS_END at 11:01:04)

SNT1

4010

12:09:33

12:20:19

11.4

XRT: Table Upload

KRN1

6030

13:11:43

13:25:24

65.0

Monitoring after solar eclipse
(OP issues AOCU_SLR_ECLPS_END at 12:54:31)

KRN1

6040

14:48:43

15:02:29

85.4

Monitoring after solar eclipse
(OP issues AOCU_SLR_ECLPS_END at 14:35:53)
BAT: CHG_RATE HI to Low

USC34

0500

21:40:09

21:53:35

46.1

DR playback (by OP)

USC34

0600

23:18:50

23:27:35

13.5

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2026/02/17 15:13:00 - 2026/02/19 11:58:00 (UT)

Remaining amount
(prediction)

0 Mbits @ OP_START ( 2026/02/17 15:13:00 )


Please be sure to use more than 2247Mbits of observation data by the first 00:00UT in order to avoid the situation of an empty DR.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

5041

2147

2147

DR TLMLMT [Mbits]

3624 @OP_START
-> 6820

2888

2888


daily note

*****
Request to SOT (from XRT):
If there is SOT Table Upload on Tuesday, 2/17, please do that in the second pass instead of the usual third pass, as the duration of the third pass (SNT1) is short and two table uploads (SOT and XRT) are not likely to be completed within the third pass.

OP_START time will be 15:13:00 UT on 02/17.
*****

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

SOT:
- 2/17 HOP 485 N60
- AR observations
note - we will try not to have a SOT table load

EIS:
- 2/17 HOP 485(?)
- AR observations


XRT:
- 02/17 HOP 485
- HOP 349 (4-6 UT everyday, if possible)
- HOP 448 (Synoptic)
- AR obs.

[Maintenance Note]
The ebina(NAS for cp/co machine)  will be replaced on the following dates.
Please be advised that cp/co(xrtco,eisco,sotcows1/2) can't used during the work.
from 15:00 to 18:00 on Feb. 17(Tue)(JST)

[Maintenance Note (Saruki)]
The following machines will be maintained at 15:00-18:00(JST) on Tuesday, February 17th.
The machines will be rebooted.
Data distributors for real time operation are not related to this maintenance.
Please report if you have any trouble.
 datastrg1(Data distributor used for transfer of commands)



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Enohi

Enohi

Shine (RCO)

Yoshimura (RCO)

Hansteen (RCO)

MORNING


operation files

pointing file : cmdpln/20260217/re-point_202602170100.txt