Daily Events on 2025/07/15 (Tue)

last updated at  2025/07/05 20:57:39 JST


<< prev day

@

next day >>


Station

Pass No.
20250715-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:05:39

07:18:26

26.7

OP/OG upload
SOT: TI-CMD
XRT: TI-CMD
EIS: TI-CMD

USC20

0100

08:12:50

08:23:37

12.9

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
DR playback (by OP)

KRN1

6020

08:30:11

08:42:58

27.5

USC20

0200

09:48:12

10:00:50

46.4

Backup for Table Uploads
DR playback (by OP)

USC20

0400

21:47:31

22:01:03

57.3

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Enohi

Enohi

MORNING


operation files

pointing file : none