Daily Events on 2025/05/10 (Sat)

last updated at  2025/05/04 20:05:42 JST


<< prev day

@

next day >>


Station

Pass No.
20250510-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:29:07

07:42:25

51.4

OP/OG upload
SOT: TI-CMD
XRT: TI-CMD
EIS: TI-CMD

USC34

0100

08:35:37

08:47:53

23.6

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
EIS: Table Upload
DR playback (by OP)

USC34

0200

10:12:26

10:24:12

24.3

DR playback (by OP)
XRT: Table Upload
SOT: Table Upload

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

EIS:
- Trans-equatorial coronal loops at the west limb (T.O.O.)
- AR obs

XRT:

- HOP 349
- Synoptics/HOP 448
- AR Obs.
- Straylight measurement

SOT:
- AR obs


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Kotanagi/Natsume

Natsume

Fleming (RCO)

Japan

MORNING


operation files

pointing file : none