| Daily Events on 2024/10/24 (Thu) | last updated at 2024/10/24 10:30:32 JST |
| Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
|
AOS |
LOS |
||||
MSP1 |
8000 |
07:18:57 |
07:32:15 |
39.4 |
OP/OG upload XRT: TI-CMD EIS: TI-CMD |
USC20 |
0100 |
08:25:50 |
08:37:27 |
18.3 |
OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup) AOCS: Upload pointing table EIS: Table Upload DR playback (by OP) |
USC34 |
0200 |
10:02:07 |
10:14:12 |
30.8 |
DR playback (by OP) XRT: Table Upload |
|
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information OP main: 2024/10/24 11:16:00 - 2024/10/26 11:16:00 (UT)
DR usage: The DR would become empty on Oct 25 at 18 UT if all telescopes took no images until that time.
daily note SOT: - HOP 485 S60 high latitude magnetic field - HOP 393 - AR obs. (NOAA 13863) XRT: - HOP 448 (synoptics) - HOP 349 (usually 4-6UT) - HOP 393 - AR obs (NOAA 13863) EIS: - HOP 491 [SOOP] on 10/24-25 - HOP 393 - AR obs (NOAA 13863) Co-alignment program run: Please run co-alignment program during the period for the three instruments. - If the solar condition is not permitted, please delay to the next timeline. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA and twilight periods. - For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program - For EIS, please run Imada's new co-alignment program
|
|
operation files pointing file : cmdpln/20241024/re-point_202410248000.txt |