Daily Events on 2024/08/27 (Tue)

last updated at  2024/08/27 11:19:59 JST


<< prev day

@

next day >>


Station

Pass No.
20240827-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:47:43

08:01:16

89.0

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD

KRN1

6020

09:12:31

09:24:45

21.1

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload

PRT1

2000

10:15:38

10:28:17

23.3

XRT: Table Upload

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2024/08/27 11:12:00 - 2024/08/29 11:46:00 (UT)

Remaining amount
(prediction)

3973 Mbits @ OP_START ( 2024/08/27 11:12:00 )


DR usage: The DR would become empty on Aug 28 at 9 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

50

25

25

DR allocation [Mbits]

3679

1839

1839

DR TLMLMT [Mbits]

1369 @OP_START
-> 5209

2588

2588


daily note

****************************************************************************************
!! CMD passes are changed !!(Because of Typhoon)
 *USC20   20240827-0100  2024/08/27 08:53:45 - 08:55:01 ---> 09:05:43 - 09:06:25  
->*KRN1    20240827-6020  2024/08/27 09:12:31 - 09:13:57 ---> 09:23:21 - 09:24:45  
 *USC20   20240827-0200  2024/08/27 10:31:50 - 10:33:25 ---> 10:41:45 - 10:42:25  
->*PRT1    20240827-2000  2024/08/27 10:15:38 - 10:17:03 ---> 10:26:53 - 10:28:17  
****************************************************************************************

XRT:
- HOP 206 (8/28)
- HOP 420
- HOP 349
- HOP 448 (synoptics)
- AR observations

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

SOT:
- HOP 206 (8/28)
- HOP 420
- AR observation

EIS:
- HOP 206 (8/28)
- HOP 420
- AR observation


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arai

Yoshida

Yoshida

Matsumoto

Young

MORNING


operation files

pointing file : cmdpln/20240827/re-point_202408278000.txt