Daily Events on 2024/08/13 (Tue)

last updated at  2024/08/12 10:37:00 JST


<< prev day

@

next day >>


Station

Pass No.
20240813-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

08:09:03

08:22:26

48.5

OP/OG upload
SOT: TI-CMD
XRT: TI-CMD
EIS: TI-CMD

USC20

0200

09:14:43

09:27:44

70.8

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
DR playback (by OP)

PRT1

2000

10:36:40

10:50:01

40.8

XRT: Table Upload
SOT: Table Upload

USC20

0300

10:54:19

11:02:24

7.4

No-commanding pass
DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2024/08/13 11:32:00 - 2024/08/15 11:35:00 (UT)

Remaining amount
(prediction)

4056 Mbits @ OP_START ( 2024/08/13 11:32:00 )


DR usage: The DR would become empty on Aug 14 at 11 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

3167

1348

1348

DR TLMLMT [Mbits]

1433 @OP_START
-> 5245

2214

2214


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

XRT:
- HOP 130
- AR observations
- Co-alignment
- HOP 349 (daily 04-06 UT)

EIS:
- HOP 130
- AR observations
- Co-alignment

SOT:
- HOP 130
- AR observations
- Co-alignment

POINTING:
2024/08/13 12:22:00.000    |  936.0    |    0.0  | HOP130 01/15
2024/08/13 12:38:00.000    |  468.0    |    0.0  | HOP130 02/15
2024/08/13 12:54:00.000    |    0.0    |    0.0  | HOP130 03/15
2024/08/13 13:10:00.000    | -468.0    |    0.0  | HOP130 04/15
2024/08/13 14:00:00.000    | -936.0    |    0.0  | HOP130 05/15
2024/08/13 14:16:00.000    |  815.0    |  470.0  | HOP130 06/15
2024/08/13 14:26:00.000    |  411.0    |  847.0  | HOP130 07/15
2024/08/13 14:42:00.000    |    0.0    |  941.0  | HOP130 08/15
2024/08/13 14:58:00.000    | -411.0    |  847.0  | HOP130 09/15
2024/08/13 15:46:00.000    | -815.0    |  470.0  | HOP130 10/15
2024/08/13 15:56:00.000    |  815.0    | -470.0  | HOP130 11/15
2024/08/13 16:06:00.000    |  411.0    | -847.0  | HOP130 12/15
2024/08/13 16:22:00.000    |    0.0    | -941.0  | HOP130 13/15
2024/08/13 17:34:00.000    | -411.0    | -847.0  | HOP130 14/15
2024/08/13 17:50:00.000    | -815.0    | -471.0  | HOP130 15/15
2024/08/13 17:59:00.000    |    0.0    |    0.0  | End of HOP130
EOP




CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Ohkuma

Arai/Kotanagi

DeRosa(RCO)

Velasquez(RCO)

Arai/Kotanagi

MORNING


operation files

pointing file : cmdpln/20240813/re-point_202408138000.txt