Daily Events on 2024/07/18 (Thu)

last updated at  2024/07/18 12:25:23 JST


<< prev day

@

next day >>


Station

Pass No.
20240718-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8010

08:17:52

08:31:09

38.1

OP/OG upload
EIS: TI-CMD
SOT: TI-CMD
XRT: TI-CMD

USC20

0300

09:23:39

09:36:23

89.8

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
EIS: Resume observation
EIS: Table Upload
DR playback (by OP)

PRT1

2000

10:45:31

10:58:57

52.7

SOT: Table Upload
XRT: Resume observation (by unplanned command)
XRT: Table Upload

USC20

0500

21:23:54

21:36:56

30.6

DR playback (by OP)

USC20

0600

23:01:52

23:13:20

19.9

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2024/07/18 11:09:00 - 2024/07/20 11:10:00 (UT)

Remaining amount
(prediction)

3316 Mbits @ OP_START ( 2024/07/18 11:09:00 )


DR usage: The DR would become empty on Jul 19 at 10 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

3148

1341

1341

DR TLMLMT [Mbits]

1833 @OP_START
-> 5232

2213

2213


daily note

EIS:
- HOP 393 (Cycle 24/25 transition) on 07/20 around 0UT.
- HOP 81 North Pole
- AR 13745 observations

SOT:
- HOP 393 (Cycle 24/25 transition) on 07/20 around 0UT.
- HOP 81 North Pole
- AR 13745 Observations
- SOT Contact #: 1-650-644-6147

XRT:
- HOP 393 (Cycle 24/25 transition) on 07/20 around 0UT.
- HOP 349
- HOP 81 North Pole
- AR 13745 observations


Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Kotanagi

Cruz (RCO) --> Shine (RCO)

Guliano (RCO)-->Matsumoto

Brooks (RCO)

MORNING


operation files

pointing file : cmdpln/20240718/re-point_202407188010.txt