Daily Events on 2024/05/14 (Tue)

last updated at  2024/05/14 15:58:07 JST


<< prev day

�@

next day >>


Station

Pass No.
20240514-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:41:44

07:55:14

77.6

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
XRT: CCD Bakeout HTR ON

USC34

0100

08:47:56

09:00:55

33.9

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload orbital element
AOCS: Upload pointing table
EIS: Table Upload
DR playback (by OP)
XRT: CCD Bakeout HTR ON

USC34

0200

10:25:40

10:36:48

17.3

DR playback (by OP)
XRT: CCD Bakeout HTR ON
XRT: Table Upload
SOT: Table Upload

USC34

0300

20:48:59

20:59:32

11.2

DR playback (by OP)
XRT: CCD Bakeout HTR ON

USC34

0400

22:25:01

22:38:13

48.5

DR playback (by OP)
XRT: CCD Bakeout HTR ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2024/05/14 11:18:00 - 2024/05/16 10:36:00 (UT)

Remaining amount
(prediction)

3655 Mbits @ OP_START ( 2024/05/14 11:18:00 )


DR usage: The DR would become empty on May 15 at 6 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

3753

1598

1598

DR TLMLMT [Mbits]

1650 @OP_START
-> 5808

2453

2453


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


EIS:
- AR observations
- Co-alignment
- HOP 81 S-pole (5/14)

XRT:
- Post bakeout observations (5/15)
- AR obs.
- HOP 448 synoptics
- HOP 349
- Stray light measurements
- HOP 81 S-pole (5/14)
- Co-alignment

SOT:
- HOP 81 S-pole (5/14)
- AR observation
- Co-alignment

POINTING:
2024/05/15 12:40:00.000    | -528.4    | -528.4  | Post bakeout Q1
2024/05/15 12:50:00.000    |  528.4    | -528.4  | Post bakeout Q2
2024/05/15 13:00:00.000    |  528.4    |  528.4  | Post bakeout Q3
2024/05/15 13:10:00.000    | -528.4    |  528.4  | Post bakeout Q4
2024/05/15 13:20:00.000    |    0.0    |    0.0  | Post bakeout synoptics
2024/05/15 13:30:00.000    |    0.0    |    0.0  | End of synopitcs
EOP


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Yoshida

Yoshida

Fleming(RCO)

Itami

MORNING


operation files

pointing file : cmdpln/20240514/re-point_202405148000.txt