Daily Events on 2024/02/13 (Tue)

last updated at  2024/02/13 10:32:41 JST


<< prev day

@

next day >>


Station

Pass No.
20240213-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

07:54:06

08:03:06

7.3

No-commanding pass
DR playback (by OP)
XRT: CCD bakeout HTR ON

MSD1

3200

09:28:03

09:41:41

81.2

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
XRT: CCD bakeout HTR ON

SNT1

4010

10:18:28

10:31:49

40.0

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
XRT: CCD bakeout HTR ON
EIS: Table Upload

PRT1

2000

10:50:01

11:03:49

61.8

XRT: Table Upload
XRT: CCD bakeout HTR ON

USC20

0400

21:28:53

21:41:51

34.3

DR playback (by OP)
XRT: CCD bakeout HTR ON

USC20

0500

23:07:19

23:17:18

16.9

DR playback (by OP)
XRT: CCD bakeout HTR ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2024/02/13 11:14:00 - 2024/02/15 11:16:00 (UT)

Remaining amount
(prediction)

3862 Mbits @ OP_START ( 2024/02/13 11:14:00 )


DR usage: The DR would become empty on Feb 14 at 15 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

57

18

25

DR allocation [Mbits]

3302

1042

1448

DR TLMLMT [Mbits]

1624 @OP_START
-> 5422

1690

2360


daily note

* Major Flare Watch on AR 13576 *

SOT:
- AR 13576 flare watch

EIS:
- AR 13576 flare watch

XRT:
- XRT Bakeout Heater OFF ~6UT on 02/14
- post bakeout observations (4 quadrant + synoptics)
- HOP 448 (synoptic)
- AR 13576 flare watch

Co-alignment program run: *Postponed due to MFW *
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -990*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


POINTING:
2024/02/14 12:00:00.000    | -528.4    | -528.4  | Post bakeout Q1
2024/02/14 12:10:00.000    |  528.4    | -528.4  | Post bakeout Q2
2024/02/14 12:20:00.000    |  528.4    |  528.4  | Post bakeout Q3
2024/02/14 12:30:00.000    | -528.4    |  528.4  | Post bakeout Q4
2024/02/14 12:40:00.000    |    0.0    |    0.0  | Post bakeout synoptics
2024/02/14 12:50:00.000    |    0.0    |    0.0  | End of synopitcs
EOP



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Brooks

Tiwari (RCO)

Yoshimura (RCO)

Brooks

MORNING


operation files

pointing file : cmdpln/20240213/re-point_202402133200.txt