| Daily Events on 2023/11/07 (Tue) | last updated at 2023/11/07 10:29:39 JST |
| Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
|
AOS |
LOS |
||||
MSP1 |
8000 |
07:58:03 |
08:11:37 |
65.8 |
OP/OG upload XRT: TI-CMD EIS: TI-CMD XRT: CCD bakeout HTR ON |
USC20 |
0200 |
09:04:09 |
09:16:51 |
52.4 |
OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup) AOCS: Upload pointing table AOCS: Upload orbital element EIS: Table Upload DR playback (by OP) XRT: CCD bakeout HTR ON |
USC20 |
0300 |
10:43:03 |
10:52:16 |
10.2 |
DR playback (by OP) XRT: Table Upload XRT: CCD bakeout HTR ON |
USC20 |
0400 |
21:04:58 |
21:16:59 |
18.5 |
DR playback (by OP) XRT: CCD bakeout HTR ON |
USC20 |
0500 |
22:42:18 |
22:54:35 |
31.2 |
DR playback (by OP) XRT: CCD bakeout HTR ON |
|
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information OP main: 2023/11/07 11:55:00 - 2023/11/09 10:53:00 (UT)
Please be sure to use more than 863Mbits of observation data by the first 00:00UT in order to avoid the situation of an empty DR.
daily note EIS: - HOP 81 - AR 13480 observation SOT: - HOP 81 S pole fast (11/7) - AR 13480 obs. XRT: - CCD bakeout heater off ~6 UT on 11/8 - Post-bakeout quadrant pointings starting ~12 UT on 11/8: 1st Quadrant: [x,y] = [-528.4, -528.4] 2nd Quadrant: [x,y] = [+528.4, -528.4] 3rd Quadrant: [x,y] = [+528.4, +528.4] 4th Quadrant: [x,y] = [-528.4, +528.4] - Post-bakeout Synoptic right following quadrant pointings - HOP 448 (Synoptics) - HOP 349 (Daily 4-6 UT) - AR 13480 obs Co-alignment program run: Please run co-alignment program during the period for the three instruments. - If the solar condition is not permitted, please delay to the next timeline. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -990*** arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA and twilight periods. - For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program - For EIS, please run Imada's new co-alignment program
|
|
operation files pointing file : cmdpln/20231107/re-point_202311078000.txt |