Daily Events on 2023/08/08 (Tue)

last updated at  2023/08/07 10:34:14 JST


<< prev day

�@

next day >>


Station

Pass No.
20230808-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

KRN1

6010

06:06:43

06:20:32

74.6

OP/OG upload
XRT: TI-CMD
SOT: TI-CMD
EIS: TI-CMD
XRT: CCD bakeout HTR ON

MSP1

8000

07:56:03

08:09:48

69.3

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
XRT: CCD bakeout HTR ON

KRN1

6020

09:20:58

09:33:05

20.2

XRT: CCD bakeout HTR ON
XRT: Table Upload
SOT: Table Upload

PRT1

2000

10:24:11

10:37:05

29.4

Backup for Table Uploads
XRT: CCD bakeout HTR ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2023/08/08 11:21:00 - 2023/08/15 11:02:00 (UT)

Remaining amount
(prediction)

2820 Mbits @ OP_START ( 2023/08/08 11:21:00 )


DR usage: The DR would become empty on Aug 9 at 5 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

14533

6190

6190

DR TLMLMT [Mbits]

2101 @OP_START
-> 17668

7461

7461


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


SOT:
- HOP 468 (7 UT-10 UT, until 08/09)
- HOP 469 (until 08/13)
- HOP 81 (08/10 & 08/12)
- HOP 393 (08/12)
- HOP 420 (08/14)
- AR obs.


EIS:
- HOP 468 (7-10UT, -08/09)
- HOP 469 (-08/13)
- HOP 81 (08/10, 08/12)
- HOP 393 (08/12)
- HOP 420 (08/14)
- AR obs.

XRT:
- CCD bakeout heater off around 6:20 UT on 8/9
- Post-bakeout Quadra. pointings starting around 12:20 UT on 8/9:
   1st Quadrant: [x,y] = [-528.4, -528.4]
   2nd Quadrant: [x,y] = [+528.4, -528.4]
   3rd Quadrant: [x,y] = [+528.4, +528.4]
   4th Quadrant: [x,y] = [-528.4, +528.4]
 10-min for each pointing (avoid Night and SAA)
- Post-bakeout Synoptic right following Quadra. pointings

- HOP 468
- HOP 469
- HOP 81
- HOP 393
- HOP 349 (4-6 UT daily, if possible)
- HOP 420
- AR obs.



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Oba

Oba

Sakao

Itami

MORNING


operation files

pointing file : cmdpln/20230808/re-point_202308086010.txt