Daily Events on 2023/08/01 (Tue)

last updated at  2023/07/31 10:55:29 JST


<< prev day

@

next day >>


Station

Pass No.
20230801-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:10:36

07:23:46

32.4

OP/OG upload
XRT: TI-CMD
SOT: TI-CMD
EIS: TI-CMD

USC20

0100

08:17:49

08:29:01

15.3

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
DR playback (by OP)

MSP1

8010

08:48:11

08:59:58

17.4

SOT: Table Upload
XRT: Table Upload

USC20

0200

09:53:46

10:06:08

37.6

Backup for Table Uploads
DR playback (by OP)

USC20

0400

21:53:57

22:07:39

72.4

DR playback (by OP)

USC20

0500

23:33:31

23:40:41

8.6

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2023/08/01 10:35:00 - 2023/08/08 11:21:00 (UT)

Remaining amount
(prediction)

4151 Mbits @ OP_START ( 2023/08/01 10:35:00 )


DR usage: The DR would become empty on Aug 2 at 13 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

57

17

26

DR allocation [Mbits]

12970

3868

5916

DR TLMLMT [Mbits]

1459 @OP_START
-> 16470

4827

7453


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

XRT:
- HOP 349 (Daily 4-6UT when possible)
- HOP 448 (Daily synoptic)
- HOP 467 (SECCHI coordination)
- HOP 468
- HOP 393 (08/05)
- XRT Bakeout heater on 08/06 at ~6UT

EIS:
- HOP 393
- HOP 467 (SECCHI coordination)
- HOP 468
- HOP 469

SOT:
- HOP 393
- HOP 467 (SECCHI coordination)
- HOP 468
- HOP 469
- Focus testing in the last part of the timeline.



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Sakao

Lacatus

Sakao

Young (RCO)

MORNING


operation files

pointing file : cmdpln/20230801/re-point_202308018000.txt