Daily Events on 2023/06/06 (Tue)

last updated at  2023/06/06 16:54:00 JST


<< prev day

@

next day >>


Station

Pass No.
20230606-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:29:39

07:43:04

55.4

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
XRT: CCD bakeout heater ON

USC34

0100

08:36:06

08:48:42

25.7

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
DR playback (by OP)
XRT: CCD bakeout heater ON

KRN1

6020

08:54:34

09:06:58

23.2

XRT: Table Upload
XRT: CCD bakeout heater ON

USC34

0200

10:13:12

10:25:05

23.3

Backup for Table Uploads
DR playback (by OP)
XRT: CCD bakeout heater ON

USC34

0300

20:37:46

20:47:12

7.8

DR playback (by OP)
XRT: CCD bakeout heater ON

USC34

0400

22:13:18

22:26:44

66.4

DR playback (by OP)
XRT: CCD bakeout heater ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2023/06/06 11:27:00 - 2023/06/13 10:36:00 (UT)

Remaining amount
(prediction)

4110 Mbits @ OP_START ( 2023/06/06 11:27:00 )


DR usage: The DR would become empty on Jun 7 at 11 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

12354

5262

5262

DR TLMLMT [Mbits]

1404 @OP_START
-> 15782

6665

6665


daily note

SOT:
- HOP 451 ToO
- HOP 393 (06/10)
- HOP 81 S pole (06/06)
- AR Obs.
- SP darks & flats
- Co-alignment programs

EIS:
- HOP 451 ToO
- HOP 81 (S Pole) (06/06)
- HOP 393 (06/10)
- AR obs
- Co-alignment Programs

XRT:
- Bakeout heater off and Quadra pointing (12UT 7 June)
-- Pointing (duration of each pointing is 10 min without Night)
--- 1st Quadrant: [x,y]=[-528.4,-528.4]
--- 2nd Quadrant: [x,y]=[ 528.4,-528.4]
--- 3rd Quadrant: [x,y]=[ 528.4, 528.4]
--- 4th Quadrant: [x,y]=[-528.4, 528.4]
--- Synoptic after CCD Bakeout [x,y]=[0, 0]
- HOP 451 ToO
- HOP 393 (06/10)
- HOP 349 (Daily 4-6 UT)
- HOP 448 (Daily)
- AR Obs.
- Co-alignment programs

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Shimojo

Tiwari (RCO)

Shimojo

Chhabra (RCO)

MORNING


operation files

pointing file : cmdpln/20230606/re-point_202306068000.txt