Daily Events on 2023/05/09 (Tue) | last updated at 2023/05/09 19:41:20 JST |
Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
AOS |
LOS |
||||
USC20 |
0100 |
08:43:09 |
08:55:59 |
30.5 |
OP/OG upload XRT: TI-CMD SOT: TI-CMD EIS: TI-CMD DR playback (by OP) |
KRN1 |
6020 |
09:01:41 |
09:14:10 |
22.6 |
OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup) AOCS: Upload pointing table AOCS: Upload orbital element EIS: Table Upload |
USC20 |
0200 |
10:20:43 |
10:32:03 |
19.1 |
DR playback (by OP) XRT: Table Upload SOT: Table Upload |
USC20 |
0300 |
20:44:33 |
20:55:05 |
10.6 |
DR playback (by OP) |
USC20 |
0400 |
22:20:31 |
22:34:02 |
54.3 |
DR playback (by OP) |
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information OP main: 2023/05/09 11:51:00 - 2023/05/11 10:33:00 (UT)
Please be sure to use more than 2715Mbits of observation data by the first 00:00UT in order to avoid the situation of an empty DR.
daily note Co-alignment program run: Please run co-alignment program during the period for the three instruments. - If the solar condition is not permitted, please delay to the next timeline. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA and twilight periods. - For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program - For EIS, please run Imada's new co-alignment program XRT: - Stray light measurement - HOP 401 - HOP 81 - HOP 349 & 448 - AR13296 obs SOT: - HOP 401 at AR13296 - HOP 81 - AR13297 obs -> change to AR13296 obs EIS: - HOP 401 - HOP 81 (NP) - AR13296 obs
|
operation files pointing file : cmdpln/20230509/re-point_202305098000.txt |