Daily Events on 2023/03/14 (Tue)

last updated at  2023/03/14 10:32:25 JST


<< prev day

�@

next day >>


Station

Pass No.
20230314-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:45:36

07:59:12

88.8

OP/OG upload
EIS: TI-CMD
XRT: TI-CMD
XRT: CCD bakeout heater ON

USC20

0100

08:51:45

09:04:15

38.2

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
DR playback (by OP)
EIS: Table Upload
XRT: CCD bakeout heater ON

USC20

0200

10:29:54

10:40:22

14.7

XRT: Table Upload
DR playback (by OP)
XRT: CCD bakeout heater ON

USC20

0300

20:53:04

21:04:12

13.4

DR playback (by OP)
XRT: CCD bakeout heater ON

USC20

0400

22:29:26

22:42:34

41.8

DR playback (by OP)
XRT: CCD bakeout heater ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2023/03/14 11:10:00 - 2023/03/16 11:46:00 (UT)

Remaining amount
(prediction)

2254 Mbits @ OP_START ( 2023/03/14 11:10:00 )


DR usage: The DR would become empty on Mar 15 at 3 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

4318

1839

1839

DR TLMLMT [Mbits]

2406 @OP_START
-> 6262

2655

2655


daily note

EIS:
-- HOP 409 or 410 PSP perihelion on NE limb AR.
-- AR observations
-- Support Co-alignment program

SOT:
-- HOP 409 or 410 PSP perihelion on NE limb AR.
-- AR observations
-- Support Co-alignment program

XRT:
-- HOP 409 on NE limb AR.
-- HOP 448
-- HOP 349
-- AR observations
-- Support Co-alignment program
- CCD bakeout heater OFF around 6UT 3/15
- postbakeout operations around 12UT on 3/15
     Post-Bakeout four-quadrant observation   (10min each)
           Q1: [-528.4, -528.4]
           Q2: [+528.4, -528.4]
           Q3: [+528.4, +528.4]
           Q4: [-528.4, +528.4]
     Synoptic (10min)

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Brooks

Tiwari (RCO)

Testa (RCO)

Landi (RCO)

MORNING


operation files

pointing file : cmdpln/20230314/re-point_202303148000.txt