Daily Events on 2023/02/21 (Tue)

last updated at  2023/02/21 10:32:10 JST


<< prev day

�@

next day >>


Station

Pass No.
20230221-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

08:05:31

08:16:04

11.6

OP/OG upload
EIS: TI-CMD
XRT: TI-CMD
DR playback (by OP)
XRT: CCD bakeout heater ON

MSP1

8000

08:35:17

08:47:33

23.0

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
XRT: CCD bakeout heater ON

USC20

0200

09:40:44

09:53:35

54.0

DR playback (by OP)
XRT: Table Upload
XRT: CCD bakeout heater ON

USC20

0400

21:41:36

21:54:55

50.8

DR playback (by OP)
XRT: CCD bakeout heater ON

USC20

0500

23:20:36

23:28:41

11.7

DR playback (by OP)
XRT: CCD bakeout heater ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2023/02/21 10:04:00 - 2023/02/23 11:31:00 (UT)

Remaining amount
(prediction)

2891 Mbits @ OP_START ( 2023/02/21 10:04:00 )


DR usage: The DR would become empty on Feb 22 at 4 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

3870

1648

1648

DR TLMLMT [Mbits]

2062 @OP_START
-> 5894

2493

2493


daily note

* Major Flare Watch AR 13229 *

XRT:
- CCD bakeout heater OFF around 6UT 2/22
- postbakeout operations around 12UT on 2/22
      Post-Bakeout four-quadrant observation   (10min each)
            Q1: [-528.4, -528.4]
            Q2: [+528.4, -528.4]
            Q3: [+528.4, +528.4]
            Q4: [-528.4, +528.4]
      Synoptic (10min)
- T.O.O. HOP 396 with Chandrayan-2 (AR target)
- AR 13229 obs.
- HOP 448 (synoptics)

EIS:
- AR 13229 obs.
- T.O.O. HOP 396 with Chandrayan-2 (AR target)

SOT:
- AR 13229 flare watch

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -990*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Kotanagi

Brooks

Shine (RCO)

Suarez (RCO)

Itami

MORNING


operation files

pointing file : cmdpln/20230221/re-point_202302210100.txt