Daily Events on 2021/05/18 (Tue)

last updated at  2021/05/18 10:33:53 JST


<< prev day

@

next day >>


Station

Pass No.
20210518-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC34

0200

08:51:01

09:03:34

42.9

OP/OG upload
EIS: TI-CMD
XRT: TI-CMD
DR playback (by OP)

SNT1

4010

09:41:46

09:54:01

19.3

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload

USC20

0300

10:29:31

10:39:29

12.8

DR playback (by OP)
XRT: Table Upload

USC20

0400

20:52:28

21:04:12

15.8

DR playback (by OP)

USC20

0500

22:29:05

22:42:16

37.5

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2021/05/18 11:09:00 - 2021/05/20 11:16:00 (UT)

Remaining amount
(prediction)

3215 Mbits @ OP_START ( 2021/05/18 11:09:00 )


DR usage: The DR would become empty on May 19 at 7 UT if all telescopes took no images until that time.


SOT

XRT

EIS

DR allocation [%]

42

29

29

DR allocation [Mbits]

2727

1883

1883

DR TLMLMT [Mbits]

1468 @OP_START
-> 4443

3054

3054


daily note

Co-alignment program run:

Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

XRT: (RCO phone: 1-617-496-1156)
- AR obs.
- HOP 130 (5/18) - postponed to next plan.
- EUNIS rocket obs support (5/18 ~18UT)
- Stray light measurements
- HOP 349

SOT:
- EUNIS Rocket (5/18)
- HOP 417: coordination with GREGOR/IRIS (5/18, 5/19)
- AR obs.

EIS:  (RCO phone: +1-703-894-8275)
- EUNIS Rocket (5/18)
- HOP 130 (5/18) - postponed to next plan.
- HOP 417: coordination with GREGOR/IRIS (5/18, 5/19)
- AR obs.




CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Tezuka

Brooks

Tiwari (RCO)

Takeda(RCO)

Ugarte (RCO)

MORNING


operation files

pointing file : cmdpln/20210518/re-point_202105180200.txt