Daily Events on 2021/05/11 (Tue)

last updated at  2021/05/11 10:35:17 JST


<< prev day

@

next day >>


Station

Pass No.
20210511-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

08:00:07

08:10:22

11.0

OP/OG upload
EIS: TI-CMD
XRT: TI-CMD
SOT: TI-CMD
DR playback (by OP)

USC20

0200

09:35:20

09:47:58

53.7

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
DR playback (by OP)

SNT1

4000

10:25:12

10:39:01

57.6

SOT: Table Upload
XRT: Table Upload

USC34

0500

21:36:16

21:49:47

51.2

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2021/05/11 11:21:00 - 2021/05/13 10:23:00 (UT)

Remaining amount
(prediction)

1275 Mbits @ OP_START ( 2021/05/11 11:21:00 )


Please be sure to use more than 1479Mbits of observation data by the first 00:00UT in order to avoid the situation of an empty DR.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

4667

1988

1988

DR TLMLMT [Mbits]

2935 @OP_START
-> 6935

2933

2933


daily note

HOP81 is postponed because of major flare watch.

Co-alignment program run:

Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

SOT:
- HOP395 DKIST ViSP science verification -> Cancel
- HOP417 coordination with GREGOR

XRT:
- stray light
- HOP 349 (on May 13th)
- AR observations

EIS:
- HOP 395 DKIST ViSP science verification -> Cancel
- HOP 417 (2021/05/12 to 05/13, each day 07-10 UT)
- AR observations


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Tezuka

Yoshitake

Katsukawa/Moritsuka

Takeda

Yoshitake

MORNING


operation files

pointing file : cmdpln/20210511/re-point_202105110100.txt