Daily Events on 2020/10/13 (Tue)

last updated at  2020/10/13 10:29:31 JST


<< prev day

@

next day >>


Station

Pass No.
20201013-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

KRN1

6020

07:38:46

07:52:03

37.9

OP/OG upload
EIS: TI-CMD
XRT: TI-CMD
SOT: TI-CMD

USC20

0200

08:56:56

09:09:43

58.1

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
SOT: Table Upload
DR playback (by OP)

USC20

0300

10:36:08

10:44:57

9.1

DR playback (by OP)
XRT: Table Upload

USC20

0400

20:58:01

21:10:27

20.8

DR playback (by OP)

USC20

0500

22:35:32

22:47:51

29.0

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2020/10/13 11:48:00 - 2020/10/15 10:47:00 (UT)

Remaining amount
(prediction)

3452 Mbits @ OP_START ( 2020/10/13 11:48:00 )


Please be sure to use more than 626Mbits of observation data by the first 00:00UT in order to avoid the situation of an empty DR.


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

5017

2137

2137

DR TLMLMT [Mbits]

1759 @OP_START
-> 7284

3071

3071


daily note

Co-alignment program run:

Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


SOT:
- HOP 405
- HOP 307
- HOP 79
- AR observations if possible

XRT:
- HOP 79
- HOP 406
- HOP 307
- HOP 349 (2-6UT daily, if possible)
- AR observations if possible

EIS:
- HOP 79
- HOP 398
- HOP 406
- HOP 307
- AR / BP observations
- Daily Pointing Monitoring (~6:00UT)



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Tezuka

Shimojo

Nitta (RCO)

Shimojo

Itami

MORNING


operation files

pointing file : cmdpln/20201013/re-point_202010136020.txt