Daily Events on 2020/08/18 (Tue)

last updated at  2020/08/18 10:44:05 JST


<< prev day

@

next day >>


Station

Pass No.
20200818-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC34

0200

08:52:46

09:05:45

54.7

OP/OG upload
EIS: TI-CMD
XRT: TI-CMD
DR playback (by OP)

SNT1

4010

09:43:36

09:55:57

22.5

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload

USC34

0300

10:31:46

10:41:12

10.4

DR playback (by OP)
XRT: Table Upload

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2020/08/18 11:11:00 - 2020/08/20 11:16:00 (UT)

Remaining amount
(prediction)

1822 Mbits @ OP_START ( 2020/08/18 11:11:00 )


Please be sure to use more than 1218Mbits of observation data by the first 00:00UT in order to avoid the situation of an empty DR.


SOT

XRT

EIS

DR allocation [%]

42

29

29

DR allocation [Mbits]

4293

2964

2964

DR TLMLMT [Mbits]

2053 @OP_START
-> 5892

4054

4054


daily note

Co-alignment program run:

Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

[Maintenance Note (Yamagishi), for CO/CP/RT Tohban]
Some software packages will be updated and security patch will be installed on machines
'cpws', 'xrtco', 'eisco', 'sotcows1', 'sotcows2', 'aocswin', 'higashirinkan', and 'ope-gw'
at 15:00-17:30(JST) on 18th August. When that's over, these machines will be rebooted.
Please do not use these machines during updating, and report if you have any trouble.

SOT: (CO phone is +1-408-720-8116)
- HOP396 support
- AR tracking
- QS observations

EIS:
- HOP 130 Full Disk Slot Scans
- HOP 396 support
- AR tracking
- QS observations

XRT:
- HOP 130
- HOP 396
- HOP 349 daily 2-6 UT
- AR tracking




CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Arikawa

DeRosa(RCO)

Reeves(RCO)

Kawate (RCO)

MORNING


operation files

pointing file : cmdpln/20200818/re-point_202008180200.txt