Daily Events on 2020/08/04 (Tue)

last updated at  2020/08/04 10:34:25 JST


<< prev day

@

next day >>


Station

Pass No.
20200804-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0200

08:51:38

09:04:38

53.6

OP/OG upload
EIS: TI-CMD
XRT: TI-CMD
DR playback (by OP)
XRT: CCD Bakeout Heater ON

PRT1

2000

10:13:37

10:26:48

31.3

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
XRT: CCD Bakeout Heater ON

USC20

0300

10:30:34

10:40:07

10.7

DR playback (by OP)
XRT: Table Upload
XRT: CCD Bakeout Heater ON

USC34

0400

20:53:02

21:05:03

18.6

DR playback (by OP)
XRT: CCD Bakeout Heater ON

USC34

0500

22:30:25

22:42:40

30.9

DR playback (by OP)
XRT: CCD Bakeout Heater ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

OP main: 2020/08/04 11:43:00 - 2020/08/06 11:15:00 (UT)

Remaining amount
(prediction)

3648 Mbits @ OP_START ( 2020/08/04 11:43:00 )


Please be sure to use more than 312Mbits of observation data by the first 00:00UT in order to avoid the situation of an empty DR.


SOT

XRT

EIS

DR allocation [%]

58

15

27

DR allocation [Mbits]

5451

1409

2537

DR TLMLMT [Mbits]

1776 @OP_START
-> 7728

1961

3572


daily note

Co-alignment program run:

Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. (Please utilize new XOBs 1C89 and 1C8A)
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

XRT:
- CCD Bakeout Heater turn off (around 6 UT on 8/05).
- Post-bakeout quadra. pointings after 12 UT on 8/05, 10 min. each.
  Q1: [-528.4, -528.4]
  Q2: [+528.4, -528.4]
  Q3: [+528.4, +528.4]
  Q4: [-528.4, +528.4]
- Synoptic to follow the pointings.
- HOP 349 (daily if possible; 2-6 UT)
- Co-alignment
- AR 12769 Observations

EIS:
- HOP 81, N pole fast
- AR observations
- Co-alignment
- Pointing Monitoring

SOT:
- AR observations
- Co-alignment
- HOP 81, N pole fast



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Tezuka

Masuda

Shine (RCO)

Masuda

Itami

MORNING


operation files

pointing file : cmdpln/20200804/re-point_202008040200.txt