| Daily Events on 2009/07/07 (Tue) | last updated at 2009/07/07 10:38:34 JST |
| Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
|
AOS |
LOS |
||||
USC20 |
0100 |
07:24:21 |
07:35:07 |
12.6 |
OP/OG upload XRT: TI-CMD EIS: TI-CMD SOT: TI-CMD DR playback (by OP) |
USC20 |
0200 |
08:59:57 |
09:12:43 |
48.3 |
OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup) AOCS: Upload pointing table AOCS: Upload orbital element DR playback (by OP) EIS: Recovery EIS: Table Upload |
SNT1 |
4000 |
09:49:55 |
10:03:47 |
64.5 |
XRT: Table Upload SOT: Table Upload |
USC34 |
0400 |
21:01:39 |
21:15:25 |
59.9 |
DR playback (by OP) |
USC34 |
0500 |
22:41:00 |
22:48:57 |
10.8 |
DR playback (by OP) |
|
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information
daily note Observation of AR 11024 Co-alignment program run: Please run co-alignment program on July 6 or 7 for the three instruments. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA periods. Eclipse: A rehearsal on July 10 (HOP0122). - Please set TLMLMT exactly the same with the DR allocation for each instrument on this day. [Bando-san to perform this operation.] - Please put the eclipse plan in the backup period. See detail the page on July 9. SOT: Large FOV AR monitoring program (SOT-Case1-2). XRT: TESIS coordination HOP 121 (AR 11024) Standard AR program EIS: Follow AR 11024 with taking slot images. K.Muglach, RCO, contact: kmuglach AT gmx.de, +1 202 404 1506 (office)
|
|
operation files pointing file : none |