Daily Events on 2009/06/23 (Tue)

last updated at  2009/06/22 10:39:10 JST


<< prev day

�@

next day >>


Station

Pass No.
20090623-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:23:09

07:36:44

49.0

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD

USC34

0200

08:29:14

08:42:12

71.2

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
DR playback (by OP)
EIS: Table Upload

SNT1

4000

09:19:45

09:32:51

29.3

SOT: Table Upload
XRT: Table Upload

USC34

0300

10:09:09

10:17:03

7.1

No-commanding pass
DR playback (by OP)

USC20

0400

20:31:19

20:44:10

25.9

DR playback (by OP)

USC20

0500

22:09:16

22:21:13

23.6

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Co-alignment program run:
Please run co-alignment program on June 23 or 24 for the three instruments.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA periods.


SOT:
-- support HOPs 79 and 81
-- Fast deep mode and NaIVDG + Gband observation for polar jet observation (HOP81)
-- 3 continuum, Ca, and G-band observation  for irradiance scan E-W direction -- we need to observe 22 points and for more than 10 minutes (15 minutes, better) at each points.
(HOP 79)


XRT:
-- support HOP81 (South polar Observation)

EIS:
-- Support HOP81
-- polar jet observations for as long as possible at N or S pole (measure temperature in reconnection region). Perhaps continue on from HOP81?

[Maintenance Note (Morita)]
Telemetry gateway machines from non-JAXA stations will be maintenanced at 9:00-18:00(JST) on Tuesday the 23th of June.
The services will not be stopped. Please report if you have any trouble.


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Hara

Iida

Minoshima

David H Brooks

MORNING


operation files

pointing file : none