Daily Events on 2009/06/16 (Tue)

last updated at  2009/06/15 11:25:09 JST


<< prev day

�@

next day >>


Station

Pass No.
20090616-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

07:26:56

07:37:47

13.2

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
DR playback (by OP)

USC20

0200

09:02:40

09:15:19

45.2

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
DR playback (by OP)
EIS: Table Upload

SNT1

4000

09:52:29

10:06:26

68.3

XRT Table Upload
SOT Table Upload

USC20

0400

21:04:18

21:18:00

63.3

DR playback (by OP)

USC20

0500

22:43:46

22:51:19

10.0

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Co-alignment program run:
Please run co-alignment program on June 16 for the three instruments.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA periods.


XRT:
-AR dynamics
-AR thermal observations
-Dry run for eclipse observations (20 min).

EIS:
- CME on set on east limb.




CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Narukage

Ichimoto

Shimojo

Bewsher, Williams (RCO)

MORNING


operation files

pointing file : none