| Daily Events on 2009/06/06 (Sat) | last updated at 2009/06/05 11:27:38 JST |
| Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
|
AOS |
LOS |
||||
USC20 |
0100 |
07:45:52 |
07:58:02 |
21.8 |
OP/OG upload XRT: TI-CMD EIS: TI-CMD SOT: TI-CMD DR playback (by OP) |
USC20 |
0200 |
09:22:47 |
09:34:49 |
26.8 |
OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup) AOCS: Upload pointing table EIS: Table Upload DR playback (by OP) |
SNT1 |
4000 |
10:12:13 |
10:26:10 |
72.7 |
SOT: Table Upload XRT: Table Upload |
USC20 |
0400 |
21:24:04 |
21:37:43 |
76.1 |
DR playback (by OP) |
|
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information
daily note Tracking AR 11019 most of the day, with HOP 71 at appropriate times. SOT: -Sunrise launch window HOP 120 -HOP 71 VTT joint observation -Flat field observations. XRT: -Support HOP 120, 71 - ToO HOP 123, coronal waves, requires AR. Note: XRT will conduct remote operations from MAY 29 through JUN 12. Please use Yugma for the morning operations meetings, and dial in to the telecon phone number (see telephone-number card in Hinode morning-meeting room). To contact the XRT Chief Observer, please call +1-617-496-1156 (US phone number). EIS: - HOP 120 (SUNRISE) - HOP 71 (if continuing) - Watanabe-san's yori dori midori. - AR flare tests. Co-alignment program run: Please run co-alignment program on June 8 for the three instruments. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA periods.
|
|
operation files pointing file : none |