| Daily Events on 2009/05/14 (Thu) | last updated at 2009/05/14 10:54:36 JST |
| Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
|
AOS |
LOS |
||||
USC20 |
0200 |
08:11:03 |
08:23:51 |
41.9 |
OP/OG upload XRT: TI-CMD EIS: TI-CMD SOT: TI-CMD DR playback (by OP) |
PRT1 |
2000 |
09:32:18 |
09:45:21 |
26.0 |
OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup) AOCS: Upload pointing table EIS: Table upload XRT: Table upload XRT: CCD bakeout heater on |
USC20 |
0300 |
09:49:32 |
10:00:00 |
14.0 |
SOT: Table upload DR playback (by OP) |
USC34 |
0400 |
20:13:32 |
20:25:02 |
15.2 |
DR playback (by OP) |
USC20 |
0500 |
21:50:14 |
22:03:17 |
37.4 |
DR playback (by OP) |
|
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information
daily note XRT: XRT RCO phone number: 1-617-496-1156 - Perform CCD bakeout (bakeout heater on in the second pass). Bakeout heater to be turned off by OP 12 hours after heater on (i.e., at around 21:45 UT on 14 May). XRT table upload also requested in the second pass. - Perform quadrant exposures at 4 pointing 6 hours after heater off from around 03:45 UT on 15 May Pointing locations are: (-528.4, -528.4) for SE Quadrant (528.4, -528.4) for SW Quadrant (528.4, 528.4) for NW Quadrant (-528.4, 528.4) for NE Quadrant Stay 10 minutes for each quadrant pointing. EIS: - HOP 73 support (up to 14th, 08:00 - 12:00 UT) - Active region diagnostic studies close to disk center (13-15 May?). SOT and XRT support if possible. - HOP 119 (15th onwards, 08:00 - 12:00 UT) - Pre-flare activity monitoring - CME watch - Large FOV scan over two ARs with three pointings (with SOT). SOT: - HOP 118 with SHAZAM. - HOP 119 with CRISP/SST. - Large FOV SP scan over two ARs with three pointings (with EIS).
|
|
operation files pointing file : none |