Daily Events on 2009/05/12 (Tue)

last updated at  2009/05/11 11:18:06 JST


<< prev day

�@

next day >>


Station

Pass No.
20090512-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8010

07:28:24

07:41:39

42.9

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD

USC34

0200

08:34:13

08:47:14

80.0

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
DR playback (by OP)
EIS: Table upload

SNT1

4010

09:24:46

09:37:52

31.7

XRT: Table upload
SOT: Table upload

USC20

0400

20:36:27

20:49:16

28.1

DR playback (by OP)

USC20

0500

22:14:35

22:26:04

20.8

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Co-alignment program run:
Please run co-alignment program on May 13 for the three instruments.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA periods.


XRT: XRT RCO phone number: 1-617-496-1156
- HOP 73 support
- CME Watch, AR observations.

EIS:
- HOP 73 support
- CME watch (to be coordinated with XRT)
- test of new study (high cadence AR and jet diagnostic study)

SOT:
- HOP 73 AR filament
- HOP 118 Coordinated Obs with SHAZAM
- continuous AR SP scan


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Sterling

Isobe

Lee (RCO)

Young (RCO)

MORNING


operation files

pointing file : none