Daily Events on 2009/04/09 (Thu)

last updated at  2009/04/09 13:36:56 JST


<< prev day

@

next day >>


Station

Pass No.
20090409-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

07:43:21

07:55:30

20.2

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
DR playback (by OP)

MSP1

8010

08:14:37

08:25:45

13.6

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
EIS: Table Upload

USC20

0200

09:20:02

09:32:25

30.2

DR playback (by OP)
XRT: Table Upload
SOT: Table Upload

USC20

0400

21:21:33

21:35:18

84.3

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Note: XRT will conduct Remote Operations from Mar. 20th through Apr.
9th, 2009 (JST).  Please continue using Yugma for the Morning Operations
Meetings, and dial in to the telecon phone number (see
telephone-number card in Hinode morning-meeting room). To contact the
XRT Chief Observer, please call +1-617-496-1156 (US phone number).

This is a two-day plan.


SOT:
- support HOP116.
- support quiet-sun observation proposed by EIS CO.


EIS:
- HOP 116: wide range of temperature raster on XBP and South polar hole.
- Core-team plan (Ugarte-Urra): Quiet Sun diagnostics and evolution (disk center, need SOT/XRT supports).
- Core-team plan (Young): Coronal Hole Density Measurement (polar or equaterial).

XRT:
- HOP 116. Nominal time 12-18 UT, XBP at on-disc CH boundary (9 Apr), and
 South polar hole (10 Apr).






CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Yasuda

Sterling

Magara -> Berger

Grigis(RCO)

Imada, S.

MORNING


operation files

pointing file : none