Daily Events on 2009/04/07 (Tue)

last updated at  2009/04/07 10:45:28 JST


<< prev day

@

next day >>


Station

Pass No.
20090407-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

08:06:04

08:18:52

35.9

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
DR playback (by OP)

SNT1

4000

08:57:19

09:08:53

15.7

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload

USC20

0200

09:44:10

09:55:13

16.5

DR playback (by OP)
XRT: Table Upload
SOT: Table Upload

USC34

0300

20:08:35

20:19:50

13.3

DR playback (by OP)

USC34

0400

21:45:02

21:58:27

44.4

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Note: XRT will conduct Remote Operations from Mar. 20th through Apr.
9th, 2009 (JST).  Please continue using Yugma for the Morning Operations
Meetings, and dial in to the telecon phone number (see
telephone-number card in Hinode morning-meeting room). To contact the
XRT Chief Observer, please call +1-617-496-1156 (US phone number).

This is a two-day observation plan.


[Maintenance Note (Yamagishi), for CO/CP/RT Tohban]
Some software packages will be updated with command 'yum update' on machines
'cpws', 'xrtco', and 'eisco' at 15:00-18:00(JST) on Tuesday the 7th of April.
When that's over, the machine 'aocswin' will be rebooted.
Please report if you have any trouble.


Co-alignment program run:
Please run co-alignment program on April 7 or 8 for the three instruments.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA periods.


SOT:
- HOP 115, one remaining pointing at -75 deg.
- Support HOP116.
- Support flux-cancellation observation proposed by EIS CO.

EIS:
- HOP 116(Korreck): wide range of temperature raster, target bright region at NW limb.
- Core plan (Yokoyama): TR Doppler and magnetic features of cancellations (QS/AR/CH near disk center, need SOT, XRT supports).

XRT:
- HOP 116. Nominal time 12-18 UT, target is bright area at NW limb.
- XRT will perform a mutli-filter synoptic, to be done during extended synoptic.
- Observe XBP at on-disc CH boundary, telemetry permitting.



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Sakao

Magara

Grigis(RCO)

Watanabe, K.

MORNING


operation files

pointing file : none