Daily Events on 2008/12/18 (Thu)

last updated at  2008/12/18 10:37:06 JST


<< prev day

@

next day >>


Station

Pass No.
20081218-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

MSP1

8000

07:20:06

07:33:45

60.5

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD

USC20

0200

08:26:05

08:39:11

58.0

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
DR playback (by OP)
EIS: Table Upload
XRT: Table Upload
XRT: Bake-heater ON
SOT: Table Upload (if possible)

USC34

0300

10:05:22

10:14:40

9.9

DR playback (by OP)
SOT: Table Upload (bkup)

USC20

0500

22:06:09

22:18:22

28.1

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

SOT:
- HOP 81: Polar Monitoring Campaign (around the SAA-free period on Dec 19th)
- HOP 79: E-W latitude scans each require about 13 pointings on 18th Dec.


XRT:
- CCD Bakeout - 12hr duration, the same as the last.

18th  ~10 UT (bakeout heter on)--> ~22 UT (heater off) ---> 19th 4UT (restart observations)
Turn on bake-out heater by real-time command and turn off it by OP command

 * Bake Heater On scheduled in the 2nd pass.
 * CCD Heater turn-on from the OP_start time to OP_start time + 12hrs
 * No XRT science observation for 6hrs after CCD Heater turn off  
 * CCD bakeout monitor observations
 * Four-Quadrant observations in G-band
 * Full or Partial Dither observations (ideally full dither), likely
   delayed until weekend.

- HOP81 Polar Monitor starting at 10UT on Dec 19th.

EIS:
- HOP 81 (Shimojo)
- Equitorial CH diagnostics (Warren & Kwan Ko).



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Sterling

Bando -> Kubo

Kotoku

D.R. Williams

MORNING


operation files

pointing file : none