| Daily Events on 2008/11/27 (Thu) | last updated at 2008/11/26 11:20:31 JST |
| Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
|
AOS |
LOS |
||||
MSP1 |
8000 |
07:21:54 |
07:35:38 |
58.6 |
OP/OG upload XRT: TI-CMD EIS: TI-CMD SOT: TI-CMD |
USC20 |
0200 |
08:27:59 |
08:40:59 |
59.8 |
OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup) AOCS: Upload pointing table EIS: Table upload SOT: Table Upload DR playback (by OP) |
USC20 |
0300 |
10:07:23 |
10:16:21 |
9.2 |
DR playback (by OP) XRT: Table Upload XRT: Bake-heater ON |
USC20 |
0500 |
22:07:58 |
22:20:14 |
27.5 |
DR playback (by OP) |
|
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information
daily note XRT: - Bakeout, between approx 10 on 27 Nov - 22 UT on 27 Nov. So observations resume at 4 UT on 28 Nov. - Four-quadrant observations. EIS: - Long limb pointings for studying presence of 1 MK peak and high-T tail DEM of the quiet Sun; - Support SOT wave propagation. SOT: - HOP92. Vorticity of intergranular flows. - Wave propagation in magnetic elements. [Maintenance Note (Morita)] The EBINA for file server will be maintenanced@at 15:00-15:30(JST) . The commands plan system and ISACS-DOC system will be maintenanced@at 10:00-12:00 (JST). *** Incorrect !! See correct times in Shimizu-san's note below. *** The machines will be not rebooted. Data distributors for real time operation are not related to this maintenance. Please report if you have any troubleD [Maintenance Note (Shimizu)] ISACS-DOC and common QL machines maintenance (program update) in 13-15 JST on 27 Nov.
|
|