Daily Events on 2008/10/16 (Thu)

last updated at  2008/10/15 11:28:49 JST


<< prev day

@

next day >>


Station

Pass No.
20081016-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC34

0200

08:31:29

08:44:29

64.1

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
DR playback (by OP)

USC34

0300

10:11:05

10:19:39

8.4

No commanding pass
DR playback (by OP)

USC20

0400

20:33:43

20:46:14

23.1

DR playback (by OP)

USC20

0500

22:11:32

22:23:31

25.5

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Co-alignment program:
Please run co-alignment program on Oct 16 or 17 for the three instruments.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.


XRT RCO contact number: +1-617-496-1156

XRT:
- Bakeout, between approx 11 - 23 UT on 16 Oct.
- Post-bakout dither pointing (times TBD, over the weekend).
- Four-quad pointing to be done within 6-12 hrs following hearter off.
- * Request four synoptics for three days following bakout. *  This
    is to learn about details of post-bakout contamination build-up,
    for more accurate temperature determination.
- Support HOP88 - network fibrils/microflares
- Support HOP90 - CaII jets

SOT:
- Support HOP's 88 (microflares), 90 Ca II jets), and possibly 91 (nanoflares)

EIS:
- Support for HOPs 88, 90, 91.  Also XBP onset study.


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Sterling

Frank, Kim/Ishikawa, Watanabe

Savage (RCO)

D.R. Williams

MORNING


operation files

pointing file : none