Daily Events on 2008/07/12 (Sat)

last updated at  2008/07/11 11:20:59 JST


<< prev day

@

next day >>


Station

Pass No.
20080712-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC34

0100

07:43:52

07:55:24

16.8

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
DR playback (by OP)

USC34

0200

09:20:11

09:32:36

35.1

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
EIS: Table upload
DR playback (by OP)

SNT1

4000

10:09:50

10:23:51

86.3

SOT: Table upload
XRT: Table upload

USC34

0400

21:21:40

21:35:27

81.7

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Weekend plan to be uploaded.

Note: XRT is conducting Remote Operations this week. Please continue using Yugma for the Morning Operations Meetings, and dial in to the telecon phone number (see telephone-number card in Hinode morning-meeting room). To contact the XRT Chief Observer, please call +1-617-496-1156 (US phone number).

Co-alignment program:
Please run co-alignment program on July 12 or 13 for the three instruments.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.

SOT:
- On-disk CH boundary.
- quiet sun obs.
- XBP obs. (Zoe)

XRT:
- Axions (and large scale hot QS plasma).
- Thermal analysis before and after axions.
- QS program.
- Dither pointing observation if necessary
- X-ray bright star (04:40-07:45 UT) passing near the Sun, may be used for calibration (Deluca).

EIS:
- QS cancellation (Yokoyama).



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Sterling

Zoe

Jin-Yi Lee (Ishibashi)

David H. Brooks

MORNING


operation files

pointing file : none