Daily Events on 2008/06/14 (Sat) | last updated at 2008/06/17 14:48:45 JST |
Station |
Pass No. |
Contact time (UT) |
Max. Elev. |
Events |
|
AOS |
LOS |
||||
MSP1 |
8000 |
07:10:40 |
07:24:18 |
89.8 |
OP/OG upload XRT: TI-CMD EIS: TI-CMD SOT: TI-CMD |
USC34 |
0100 |
08:17:00 |
08:30:14 |
39.2 |
OP/OG upload, XRT:TI CMD, EIS:TI CMD, SOT:TI CMD (backup) AOCS: Upload pointing table DR playback (by OP) EIS: Table Upload |
SNT1 |
4000 |
09:07:59 |
09:19:53 |
17.4 |
XRT: Table Upload SOT: Table Upload |
USC34 |
0300 |
20:19:25 |
20:30:50 |
14.4 |
DR playback (by OP) |
USC34 |
0400 |
21:56:00 |
22:09:14 |
39.9 |
DR playback (by OP) |
Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/ DR information
daily note Co-alignment program: Please run co-alignment program on June 14 or 15 for the three instruments. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec. - Not necessary to be during SAA-free time. EIS: - AR-CH interchange reconnection SOT: Support EIS and XRT, QS studies
|
operation files pointing file : none |