Daily Events on 2018/06/19 (Tue)

last updated at  2018/06/19 10:42:14 JST


<< prev day

@

next day >>


Station

Pass No.
20180619-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC34

0100

07:41:59

07:53:22

15.5

OP/OG upload
EIS: TI-CMD
XRT: TI-CMD
DR playback (by OP)

USC34

0200

09:17:55

09:30:33

39.2

OP/OG upload, XRT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
EIS: Table Upload
DR playback (by OP)

SNT1

4000

10:07:43

10:21:25

78.0

XRT: Table Upload

PRT1

2000

10:39:29

10:53:21

67.5

Table upload(backup)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

50

25

25

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Focused Mode 6/19-7/9

Co-alignment program run:

Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program


EIS:
- HOP 336 on 6/25
- QS network and coronal bright points
- AR 12713 observation
- Sensitivity monitoring
- HOP 351 (re-run)
- New AR at East


XRT:
- HOP 349  Full Sun synoptic campaign, 0-3 UT everyday.
- AR 12713 obs.
- HOP 351 (re-run)
- HOP 336 on 6/25
- New AR at East

SOT: RCO Phone Number +1 720 382 6607
- HOP 336 on 6/25
- AR 12713 obs.
- SP flats and darks
- New AR at East

[Maintenance Note (Yamagishi), for CO/CP/RT Tohban]
Some software packages will be updated and security patch will be installed on machines
'cpws', 'xrtco', 'eisco', 'sotcows1', 'sotcows2', 'aocswin', 'higashirinkan', and 'ope-gw'
at 15:00-17:30(JST) on 19th June. When that's over, these machines will be rebooted.
Please do not use these machines during updating, and report if you have any trouble.



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Hosoi

Quintero Noda

De Wijn (RCO)

Mckenzie (RCO)

Tei

MORNING


operation files

pointing file : none