Daily Events on 2016/09/29 (Thu)

last updated at  2016/09/29 11:44:02 JST


<< prev day

@

next day >>


Station

Pass No.
20160929-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

KRN1

6020

07:31:15

07:44:11

29.0

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD

USC20

0200

08:49:23

09:02:06

52.8

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
EIS: Table Upload
DR playback (by OP)

SNT1

4000

09:39:25

09:53:07

58.8

XRT: Table Upload

USC20

0500

20:50:17

21:03:54

52.6

DR playback (by OP)

USC20

0600

22:29:23

22:37:41

12.1

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

54

23

23

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
- For EIS, please run Imada's new co-alignment program

SOT
- HOP323 SST-IRIS-Hinode Campaign
Time window : 7:45 - 11:00 UT through 10/1
Target : AR with a filament and well define magnetic neutral line
- HOP315 [Flow and Magnetic Fields in the Vicinity of AR Filaments with GREGOR, VTT, DST, NST]
Time window : 14:30 - 17:00 UT through 9/29
Target : AR with a filament and well define magnetic neutral line
- AR observations


XRT:
- Support HOP315
- Support HOP323
- AR observations

EIS:
- HOP323, 315
- Instrument alignment
- AR observations
- Sensitivity monitoring(~4hrs)



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Demoto

Iwai

Zoe (RCO)->Shimizu/Ishiguro

Iwai

Ishii

MORNING


operation files

pointing file : none