Daily Events on 2015/08/04 (Tue)

last updated at  2015/08/03 10:50:00 JST


<< prev day

@

next day >>


Station

Pass No.
20150804-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

07:19:57

07:31:47

17.9

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
XRT: CCD Bake-out heater is ON
DR playback (by OP)

MSP1

8010

07:50:52

08:02:14

15.3

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
XRT: CCD Bake-out heater is ON
EIS: Table Upload

KTU1

3300

08:58:03

09:09:21

13.1

SOT: Table Upload
XRT: Table Upload
XRT: CCD Bake-out heater is ON

SNT1

4000

09:46:03

09:59:41

88.8

Backup for Table Uploads
XRT: CCD Bake-out heater is ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

EIS:
- HOP289
- HOP81
- AR observation
- EIS Spectral Atlas
- regcal 20, 71+72, 77

Co-alignment program run:
Please run co-alignment program ** around 8/9 Aug **  for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each program
- For EIS, please run Imada's new co-alignment program

SOT:
- RCO phone number +1-720-382-6607
- Support HOP 289 & 81.
- Support HOP 287 at the end of the OP.
- Flat fielding, blue continuum.

XRT:
  - bakeout ends 2015/08/05 at 6:15UT.
  - 4 quadrant pointings after CCD bakeout, from around 12:15 UT on 8/5.
  - 1st Quadrant: XOB#1AAB [x,y]=[-528.4,-528.4]
  - 2nd Quadrant: XOB#1A9F [x,y]=[528.4,-528.4]
  - 3rd Quadrant: XOB#1AA0 [x,y]=[528.4,528.4]
  - 4th Quadrant: XOB#1AA1 [x,y]=[-528.4,528.4]
  - 10 minutes each.

  - Support HOP289.
  - Support HOP81.
  - AR observations.



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Hosoi

Sakao

De Wijn (RCO)

Sakao, T.

Watanabe T.

MORNING


operation files

pointing file : none