Daily Events on 2015/01/26 (Mon)

last updated at  2015/01/26 23:02:24 JST


<< prev day

@

next day >>


Station

Pass No.
20150126-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

KRN1

6000

03:48:26

04:01:29

30.1

ALL OBS STOP

MSP1

8000

05:38:57

05:50:30

15.1

OP/OG upload (for delta V)
AOCS: Upload pointing table

MSP1

8010

07:15:30

07:28:33

35.1

OP/OG upload (backup)
LV open
ƒĒV parameter setting

USC20

0220

08:21:18

08:34:09

83.2

ƒĒV parameter setting
DR playback (by OP)

KRN1

6010

08:40:10

08:51:55

18.0

ƒĒV parameter setting

SNT1

4000

09:11:32

09:24:58

38.6

ƒĒV parameter setting(backup)

PRT1

2000

09:43:10

09:56:55

58.4

OP_STOP (by DCBC-124)

SNT1

4010

10:49:37

11:01:38

16.8

ƒĒV setting back

PRT1

2010

11:21:35

11:31:57

10.4

OP/OG upload

KRN1

6020

11:51:58

12:04:05

21.1

OP/OG upload(backup)
AOCS: Upload pointing table

USC20

0420

20:22:42

20:35:46

33.6

DR playback (by OP)

USC20

0520

22:01:12

22:11:24

17.7

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

### IMPORTANT ###  (Update: 12:20 JST on Monday, 26 Jan.)
We decided to go ahead with the DAM operation in the afternoon. Observations will be stopped in the first pass, at around 3:50 UT. Observations may be resumed from Thursday (29 Jan.) evening but it may change depending on the DAM situation.


*** We will have the Go/NoGo meeting from 10:30 JST on Monday, as scheduled.  (Update: 12:00 JST on Sunday, 25 Jan.) ***

Note:
There is possibility of DAM (debris-avoidance maneuver) operation to take place in the evening of Monday. Note this debris-approach incidence is a different one (with different debis) from the one last week. If the operation were to happen, observations will be suspended at the beginning of the DAM operation and resumed several days after. The Go/NoGo meeting for the operation is planned from 10:30 JST on Monday.

The weekly/daily meeting on Monday, 26 Jan. is currently scheduled to start from 11:00 JST, instead of usual 10:30 JST, so as to incorporate the conclusion of the Go/NoGo meeting for the possible DAM operation.



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Yasuda

Yasuda

Zoe (RCO)

Matsumoto

Lee

MORNING


operation files

pointing file : none