Daily Events on 2014/11/25 (Tue)

last updated at  2014/11/25 10:51:13 JST


<< prev day

@

next day >>


Station

Pass No.
20141125-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

USC20

0100

07:08:05

07:19:15

14.2

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD
DR playback (by OP)
XRT: CCD Bakeout Heater ON

MSP1

8010

07:38:19

07:50:28

19.7

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
XRT: CCD Bakeout Heater ON
EIS: Table Upload

USC34

0200

08:43:52

08:56:36

43.5

DR playback (by OP)
SOT: Table upload
XRT: Table upload
XRT: CCD Bakeout Heater ON

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

EIS:
- HOP79 Irradiance Scan (N-S scan)
- HOP275 AR with Hida, Hinode, IRIS (canceled on 11/26)
- tr AR
- EIS sensitivity monitoring at QS near DC

SOT:
- HOP79 Irradiance Scan (N-S scan)
- HOP275 AR with Hida, Hinode, IRIS (26th-28th)
- AR observation for Flare hunting

XRT:
- Post-Bakeout 4-Quadrant Obs (10-min each), pointings:
--- (1) [-528.4, -528.4]
--- (2) [528.4, -528.4]
--- (3) [528.4, 528.4]
--- (4) [-528.4, 528.4]

-Support HOP 275


Co-alignment program run:
Please run co-alignment program during the period for the three instruments.
- If the solar condition is not permitted, please delay to the next timeline.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 2 hours for N-limb at *** 945*** arcsec and 2 hours for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.
- For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run.
- For XRT, please take data even during SAA and twilight periods.
- For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each program
- For EIS, please run Imada's new co-alignment program


CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Demoto

Arikawa

Takasao

Arikawa

Nakada

MORNING


operation files

pointing file : none