Daily Events on 2008/07/29 (Tue)

last updated at  2008/07/29 11:03:25 JST


<< prev day

@

next day >>


Station

Pass No.
20080729-

Contact time (UT)

Max. Elev.
 (deg)

Events

AOS

LOS

KTU1

3300

06:52:40

07:03:53

14.3

OP/OG upload
XRT: TI-CMD
EIS: TI-CMD
SOT: TI-CMD

USC34

0200

08:27:55

08:40:48

54.6

OP/OG upload, XRT:TI-CMD, SOT:TI-CMD, EIS:TI-CMD (backup)
AOCS: Upload pointing table
AOCS: Upload orbital element
DR playback (by OP)
XRT: Table upload
EIS: Table upload

USC20

0300

10:07:06

10:16:22

10.1

DR playback (by OP)
SOT: Table upload

USC20

0400

20:30:08

20:42:36

20.6

DR playback (by OP)

USC20

0500

22:07:46

22:20:12

29.8

DR playback (by OP)

Flare list(LM) : http://www.lmsal.com/solarsoft/last_events/


DR information

Remaining amount
(prediction)

- Mbits @ OP_START ( )


SOT

XRT

EIS

DR allocation [%]

70

15

15

DR allocation [Mbits]

-

-

-

DR TLMLMT [Mbits]

-

-

-


daily note

Note: This OP contains AOCS command for eclipse.

Co-alignment program:
Please run co-alignment program on July 29 or 30 for the three instruments.
- The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift.
- 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec.
- Not necessary to be during SAA-free time.


XRT:
- Co-alignment
- Polar Plume Studies
- QS Studies
- Focus scan program (if possible)---> postpone to next week (maybe)

SOT:
- Co-alignment
-IBIS (sun center or ToO) 14-17UT
-continue tests of new flight s/w

EIS:
- co-alignment
- XBP study, requesting SOT support for magnetogram
- QS study
- AR loop (TOO)



CHIEF
TOHBAN

SUB
TOHBAN

CP

SOT CO

XRT CO

EIS CO

EVENING

Arikawa

Kato(Bando)

Shine

Bando(Kano)

Kamio

MORNING


operation files

pointing file : none